Hi all, I’m about to embark on an adventure in ERV (Energy Recovery System) installation! Since we had our siding updated, our home ‘envelope’ is now much tighter and more energy efficient. That means indoor air quality has been noticeably going downhill for us, and we need to do something about it soon.
First things first – some requirements:
120v outlet (yes, check)
2 feet of space between the first bend and the planned location of the ERV (check)
Hanging chain? (be back in a minute)
Choosing the right unit was really, really hard because there is very little info out there for the DIY person. I got the Panasonic intelli-ballance because Matt Risinger (home improvement internet personality) recommended it, but it would have been nice to see more reviews of units out there.
And now I wait, and I wait for the unit to arrive on 8/2/23. I’m going to draw some pictures while I wait.
Update 8/3/23
The unit arrived. Here it is sitting under where I plan to hang it in the utility room of our basement.
There are two ways to install this unit. First is by fixing it to studs in a wall which would be ideal from a usage standpoint (with the chain mounted method, you need to crouch under the device to access controls and change filters). Unfortunately, there are no walls with studs where I want to put it, and I don’t trust screwing this heavy device into my cinderblock basement walls, so chains it is. See below:
Mounted, tested and functioning A-Okay
I plan to initially have this unit act as a “stand-alone” device and not tie it into the existing ductwork because A) I won’t have time to do that for at least the next several weeks, and B) I want to see how well this setup functions as a standalone. I’m not sure we really need anything more at this time, but this will be a test period to find out, and I figure, if it works fine as a stand-alone, why fix it?
The exhaust ports will be installed through the window. I won’t have the second out-port until tomorrow as I ordered a size that won’t work with my setup. I went with two of these:
They’re primarily used for dryer and air conditioner window adapters but should work just fine for a starter ERV setup. You might be wondering why I didn’t just bore holes in the wall. I don’t really have time to do that either, and I don’t want to mess up the new siding. Also, if I wanted to move this device to another part of the basement when I have more time to spend on this, I’d then have to move the holes too. This seemed the best option, and I’ll be winter-proofing as well.
The unit is tested and we are now waiting for the other window vent to arrive (one for exhaust and one for intake). I also forgot to pick up some vent insulation in addition to metal tape (the stuff that goes on vent connections).
I’m excited to check back in tomorrow with updates on this project!
Update 8/4/23:
The second window vent adapter arrived. I had to cut them so they would fit into the window, but it works really well.
I switched it on. It’s quiet and seems to work okay. There is a ‘new unit’ smell to it, but that might also be the smell of the pipe glue (exterior intake pipe). Crossing fingers and hoping this will do the trick.
It was a 4-year process that began back in 2017 when we bought this cute little house.
Quick sketch of our cute little house
One of the first things we did after buying the house was to get rid of the old hot water tank. At that time, we weren’t thinking that far ahead – we just needed a new water tank in a hurry and on a budget we were already stretching to make the house into a more livable condition, so we got ourselves a gas powered “Fatboy” hot water tank. We eventually replaced it with an electric one in conjunction with the upgrade of our heating/cooling system a few years later. Our HVAC people re-homed the young-ish Fatboy.
Craptastic hot water tank wrapped in some silvery junk to the left, and our old blue boiler prior to upgrade. We upgraded to a gas “fatboy” hot water tank prior to upgrading again to the electric one. I didn’t take a pic of our fatboyNew electric hot water tank
The “kitchen” was originally located in what is now our living room. What is now our kitchen was originally an empty bedroom with wall-to-wall carpeting that had seen many years of frat parties. The process of building the kitchen from scratch is important because we started off with zero working appliances and took that opportunity to purchase all electric ones.
Pocket Bathroom we demoed to make room for the fridge and pantryAnother photo of the empty room that eventually became our kitchen. Here you can see radiator pipes that were re-directed to the back porch.Pocket Bathroom After Demo^^^ Kitchen before pictures ^^^
At that time, I don’t think we were planning on moving the entire house to electric, but it was cheaper and simpler to throw wires into that room than it would have been to extend the gas-line for all the appliances. I had a sketch, and our electrician hooked up the island and other appliances in accordance with my drawings.
Old cabinets left in the basement and came with the house. Underneath the layers of paint, I discovered they were solid oak so I refurbished them.More ‘found’ cabinetscabinet finish drying in basementKitchen in progress. You can see electric induction stovetop and convection oven in place.Wire octopi everywhereBefore wall cabinets went upafter wall cabinets went upBefore Behind sink backsplashafter behind sink backsplash made with reclaimed woodStove hood in progressMe installing hoodKitchen complete^^^ Kitchen “after” pictures ^^^
We also updated our breaker boxes. This really needed to happen before dedicating spaces for our new heat pumps. Before and after photos below. You can see how previous owners tried to split this house up into 4 apartments with one main box for the landlord. In the “after” photo we now have two main boxes. One services the majority of our house things including the downstairs heat pump. The other box has our car charger and upstairs heat pump.
BeforeAfter
Shortly after the kitchen was completed, we installed electric washer/dryer. For the first year we had been taking our laundry to the laundromat (we didn’t bother trying the old gas units as they looked in a bad way).
Old unitsSlop sink also demoed to make room for the new unitsEmpty space after demoNew electric washer/dryer
New HVAC system was installed without needing to open up any of the walls. Our 2 story house has a full basement and full attic. By throwing the ductwork into those unfinished spaces, we were able to save our walls (though, there isn’t anything special about our walls, it would have been super messy and more expensive). The rough sketch below details how we did it, and the only demo required was to make a closet larger to accommodate the 2nd floor handler. I initially wanted all the ductwork to also be installed within the conditioned “envelope” of the second floor and have it all run along the ceiling. However, my much taller husband disapproved of that idea, so we went with the plan below.
basement air handler2 heat pump units behind trash cansdemo closet face to make room for air handler on 2nd floorair handler installed and new closet builtcloset door closed
After the new HVAC systems were installed and functional, it was time to demo the old boiler, radiators and radiator pipes. Initially, I had planned to call the plumber and throw some money at them to disconnect all of the radiators so the junk haulers can move them out. As I was pondering the logistics and timing of this task, I noticed the HVAC people had already disconnected a couple of the radiators, and I thought to myself, ‘how hard could this possibly be?’ I purchased a 24″ heavy steel wrench and a slightly smaller hand plier for quick removal of loose bolts. Total cost was about $100 + a couple hours of work disconnecting all 15 radiators.
The haulers arrived the next day and were able to remove the 1’st floor radiators without issue. The 2nd floor radiators were an entirely different story as they would have had a nearly impossible time getting them safely down a flight of turning stairs. Luckily, back when I had been toying with the idea of doing all the heavy lifting myself, I watched a YouTube video on how to dismantle a radiator. I grabbed my 3-foot wrecking bar and went right to work, first unscrewing the long bolts that held each radiator slot together like a long sandwich, then splitting the sections into more manageable pieces with the wrecking bar. It wasn’t actually too hard to divide 7 radiators on the 2nd floor. The haulers were super thankful and happy to wait around while I split them up. The only challenge was containing the black sludge left at the bottom of the radiators. We went through all of our towels and a bunch of drop-cloths.
Mess of pipes to old boiler/radiator system with bonus ‘mystery’ tank at top right of pictureBetter shot of the “mystery” tankBetter pic of the old boiler – this was taken after much of the radiator piping was removed.Radiators were not ornamental and we do not miss themHappiness is a 2 foot wrenchgoodbye forever to corrosion leaks!Head-banging main radiator pipes in basement rec-roomBasement rec-room after overhead pipe demo
During the process of radiator removal, we also needed to have our gas line cut. When we bought the house, we had 3 gas meters and 3 accounts. I didn’t get any good photos of the unused 2 meters, but you can see where they had been in the photo below. Apparently, this setup held 5 meters at some point in the house’s history.
A little backstory on those meters: the process of removing the 2 unused meters was a nightmare experience. The gas company has 3 departments that you can reach by phone (sales, raising, and customer advocate). I know they have 3 departments because they kept transferring me to the next one where I had to explain the entire story all over again to a new person. It took weeks to get someone to come out and take the meters. A tech finally showed up, looked at the meters and said “wait a minute, this isn’t what I expected, I can’t do anything with this” then told me he might need to file for a new application and send someone else. He said he was expecting to remove 5 meters. There are only 3 meters and I told him we want to keep one of them. He said he or someone would come back that day, but nobody came back, and I received a phone call the next day telling me I needed to reschedule.
After more weeks and lots of hours on hold with multiple agents, we finally got those two extra meters removed. We were down to the one meter which we used for several years until we finally went all electric.
When it was time to remove that final meter and cut the gas to the house, I was a little nervous about working with them because of my previous experience.
Gas removal (for this area, at least) is called “abandonment”. I needed to reach out to their abandonment department which doesn’t have a phone number, so I had to do it all via email. Since they so rarely get jobs that require removal without a complete demo, they kept asking me when we’ll be “abandoning” the building, and when the demo will occur. If you do this to your house, be prepared to explain to everyone that you will not be abandoning and demoing your home. Apparently, this is something that is so rarely done, it causes great confusion at the gas company.
The steps involved for abandonment included:
Scheduling a tech to take the final meter
Cutting the gas at the street (and cutting the “riser pipe” to the house)
Getting the gas company and their contractors to take the remainder of the pipe
We are still on step 3 because the contractors were confused about what to do when they came to get the remainder of pipe. But luckily, having them come out and take the meter, then cap the line at the street was a relatively easy process. I even learned something new when a contractor showed up to mark the line. He told me we were smart for doing this because he’d seen all kinds of horrors with the condition and botched installations of residential/commercial gas lines. Go us!
Step 1: after they took the meterRiser pipe they needed to cut when they capped the line at the streetStep 2: Riser pipe is gone after they cut the gas at street levelAlso Removed 2 ugly yellow pipes that “protected” the exterior riser from cars.
For the final step, I was instructed to call a 3rd party contractor that works with Washington Gas, and they would come out to remove the extra “parts” left behind. I called the number and spoke with someone who requested pictures of the parts to be removed. I sent pictures in email and a removal date was scheduled. When the Contractor showed up, he said he was expecting to take a meter but couldn’t do anything with the long pipe on the wall or the exterior regulator. He said they would just scrap it anyway, so I asked him if I could dismantle the thing myself instead of having to wait for someone (yet again) to come out. He said that would be fine if I was comfortable doing that work. I grabbed my sawzall, and went to work. The entire demo took me only about 30 minutes.
Come get your exterior regulator, Washington Gas!Long pipe on wall came down easy with a little help from my trusty sawzall
… And this concludes the story of how we converted our house from gas to electric.